Marble-tiled bathroom with stone basin and walk-in shower

Bathroom Renovation Cost in West London: 2026 Price Guide

Most bathroom renovations in West London land between £6,000 and £12,000 in 2026. A small like for like refit starts around £4,500. A larger family bathroom with a new layout and a decent spec runs £12,000 to £18,000. The single biggest cost driver is not the tiles or the suite. It is whether the plumbing moves.

Marble tiled bathroom with stone basin and walk in shower in a Chelsea flat renovation
Chelsea flat, full bathroom refit. Marble tiling and a walk in shower. Photo: GSM Builders Ltd

What a bathroom actually costs in West London

These are the ranges we quote across Hillingdon, Ealing, Hounslow and the surrounding areas. They include labour, materials and waste removal, and they assume a working bathroom at the end, not a shell.

Type of job What it covers Typical range
Like for like refit, small bathroom Same layout, new suite, new tiling, new flooring £4,500 to £7,000
Mid range family bathroom Same layout, better spec, full re tile, new lighting and extraction £7,000 to £12,000
Bathroom with a layout change Moving the WC, bath or basin, so new pipework and often a new soil connection £10,000 to £16,000
En suite, compact Shower, WC, basin, usually squeezed into an existing room or loft £4,000 to £8,000
Wet room, level access Tanking, former, drainage falls, full waterproofing £7,000 to £13,000
High spec family bathroom Premium sanitaryware, stone or large format tiling, underfloor heating £15,000 to £25,000
GSM Builders Ltd guide ranges for West London, 2026. Ranges, not quotes. Every bathroom is a different set of problems.

For comparison, the Federation of Master Builders puts a typical UK bathroom renovation lower than these figures. That gap is real and it is mostly London labour rates, parking and access, and the age of the housing stock around here.

Where the money actually goes

En suite vanity unit and basin with marble effect wall tiles
Sanitaryware and a vanity unit. The spec you choose here swings the total more than anything else. Photo: GSM Builders Ltd

People assume the suite is the big number. It usually is not. On a mid range job the labour and the hidden trades take more than half the budget.

Element Share of a mid range job Notes
Strip out and waste 5 to 8 percent Skip or grab hire, and getting it out of a terrace with no side access
Sanitaryware and brassware 15 to 25 percent The one line you control completely
Tiles, materials 10 to 15 percent Large format and natural stone cost more to buy and far more to fit
Tiling labour 12 to 18 percent Pattern, size and how square the room is all change this
Plumbing labour 12 to 18 percent Rises sharply the moment anything moves
Electrics and extraction 6 to 10 percent Zoned lighting, shaver point, a decent extractor that meets Part F
Waterproofing and screed 5 to 8 percent Skimped on more often than any other item
Plastering and making good 6 to 10 percent Ceilings and reveals after the old stuff comes out
Typical distribution on a mid range West London bathroom. Percentages vary by job.

The thing that really moves the price: moving the pipework

Corner whirlpool bath installed in a loft conversion en suite
Moving where the bath sits means moving pipework, which is the expensive part. Photo: GSM Builders Ltd

Keeping the WC, bath and basin where they are is the difference between a straightforward week and a much bigger job. The WC is the worst offender. It needs a fall to the soil stack, so moving it can mean lifting floors, boxing in new runs, or in a flat, negotiating a route that does not cross a neighbour’s ceiling.

If you are considering a new layout, get the plumbing route agreed before you fall in love with a design. We have seen plenty of drawings that work beautifully on paper and cannot be drained.

You might not have to pay VAT at all

Modern wet room with a level access walk in shower
A level access wet room. If it is needed for a disabled person in their own home, this work can be zero rated for VAT. Photo: GSM Builders Ltd

This is the part almost nobody mentions, and it is worth thousands.

If bathroom work is needed because of someone’s disability, and it is their own private home, the work can be zero rated for VAT. Not reduced. Zero. That covers adapting or extending a bathroom, washroom or lavatory where the changes are necessary for that person, and it can cover putting back space lost to make the adaptation work. Converting a bath to a level access wet room is the common example.

The rules are set out by HMRC, you sign an eligibility declaration, and you do not need to be registered disabled. On a £10,000 job that is £2,000 that never leaves your account. Ask any builder quoting you whether they handle zero rated work, because plenty simply add VAT to everything out of habit.

How long it takes

Compact en suite shower room fitted in a loft conversion
A compact en suite costs less than a family bathroom because there is less of everything. Photo: GSM Builders Ltd
  • Like for like refit: 7 to 10 working days.
  • Layout change: 2 to 3 weeks, because first fix, tanking and screed all need drying time.
  • Wet room: 2 to 3 weeks, and the tanking is not a stage you rush.
  • Compact en suite: 5 to 8 working days if the services are already nearby.

The honest version: a bathroom is a small room with every trade in it. Plumber, electrician, tiler, plasterer and often a carpenter all need their turn, and several cannot overlap. That sequencing, not the size of the room, sets the timeline.

Where budgets slip

Bathroom with herringbone marble shower tiling
Tiling labour is where a budget quietly grows. Herringbone takes far longer to set out than a straight bond. Photo: GSM Builders Ltd
  • Choosing the tile after the quote. Herringbone, large format and natural stone all take longer to fit. The tile changes the labour, not just the material.
  • Finding out what is behind the old tiles. In 1930s West London stock that often means rotten timber, old lead runs or a wall that is nowhere near flat.
  • Underfloor heating decided late. It affects floor build up, which affects the door, which affects the flooring.
  • Extraction ignored. A weak fan grows mould that ruins a new bathroom in two winters.
  • Waterproofing treated as optional. The cheapest line to cut and the most expensive to put right.

Our guide to mistakes to avoid during a bathroom renovation goes through the rest, and bathroom wall tiling ideas covers the finish choices that change the labour.

Do you need building control?

Usually not for a straight replacement. You do need it if you are adding a bathroom where there was not one, altering drainage, or doing structural work such as removing a wall. New electrics in a bathroom are notifiable either way, so the electrician must certify the work. Our guide to Building Regulations in West London explains what gets inspected and what the council charges.

If the bathroom is part of a bigger project, the loft conversion cost guide and the kitchen renovation cost guide use the same format.

How much is a small bathroom renovation in West London?

A like for like refit in a small bathroom is usually £4,500 to £7,000 in 2026, covering strip out, a new suite, full tiling, flooring and making good. Moving the WC or bath pushes it higher.

Is it cheaper to keep the bathroom layout the same?

Much cheaper. Keeping the WC, bath and basin in place avoids new pipework, new drainage falls and lifting floors. A layout change typically adds £3,000 to £5,000 to an otherwise identical job.

Can I get a bathroom done without paying VAT?

Yes, if the work is needed because of a disability and the property is that person’s private home. The work is zero rated under HMRC’s rules, you sign an eligibility declaration, and you do not need to be registered disabled.

How long does a bathroom renovation take?

About 7 to 10 working days for a like for like refit, and 2 to 3 weeks if the layout changes or it is a wet room. Tanking and screed need drying time that cannot be rushed.

Do I need building regulations approval for a new bathroom?

Not usually for a straight replacement. You do if you are adding a bathroom where there was none, altering drainage or doing structural work. Electrical work in a bathroom is notifiable and must be certified.

Get a real number for your bathroom

Ranges only take you so far. We survey the room, tell you what is behind the tiles, and give you a written price with the spec listed, so you can compare it properly against anyone else’s quote. See our bathroom renovation service for what is included.

Call 020 8077 2121 or use the contact form. We are based in Hayes and work across West London.

Similar Posts